Ivoclar Programat P95 Manual

Place the furnace on a flat, stable surface. Ensure proper ventilation.

Integrated slow cooling function and automatic opening of the furnace head upon program completion.

Before operating the Programat P95, it is crucial to follow proper installation procedures to prevent damage and ensure safety.

Use the number keys or the "P" keys to select the desired program number. Ivoclar Programat P95 Manual

To ensure optimal performance, longevity, and consistent firing results, understanding the is crucial. This guide provides a detailed overview of the key components, operation steps, maintenance procedures, and troubleshooting tips derived from official operation documentation. 1. Introduction to the Programat P95 Furnace

| Parameter | Range | Default | Clinical Impact | | :--- | :--- | :--- | :--- | | Heating rate | 1 – 100°C/min | 10°C/min | Too fast cracks green-state ZrO₂. | | Final temp | 800 – 1600°C | 1530°C | ±10°C changes translucency. | | Hold time | 0 – 999 min | 90 min | Insufficient hold = low density. | | Cooling rate (R1/R2) | 1 – 40°C/min | 12°C/min | Too fast = crown cracks. | | Vacuum on/off | On/Off | Off (Sinter) | On = oxygen vacancies (gray). |

Once the furnace reaches the standby temperature (usually around 400°C), place the firing tray with the objects into the center of the furnace. Place the furnace on a flat, stable surface

Shows the actual temperature and setpoint value, as well as the progress of the program. Vacuum Key (V): Activates or deactivates the vacuum pump. Start/Stop Button: Initiates or cancels the firing program. Step-by-Step Operating Procedures

Occasionally, Ivoclar’s website undergoes maintenance. If you urgently need the :

Sets the idle temperature (typically between 100–700°C). T (Firing Temp): Sets the target temperature for the cycle. Before operating the Programat P95, it is crucial

If it melts early or late, use the temperature offset feature in the system settings to adjust the baseline temperature up or down. Preventive Maintenance Checklist

Be careful not to damage the blade contacts (33).

This public link is valid for 7 days and shares a thread, including any personal information you added. This link or copies made by others cannot be deleted. If you share with third parties, their policies apply. Can’t copy the link right now. Try again later.

Proper installation is critical to prevent thermal shock, electronic interference, or mechanical failure. Selecting the Location Place the furnace on a flat, level, and fireproof surface.

Keep the rear and side air vents completely unobstructed at all times.